St Mary’s Church
Nottingham. (Roof Works)
This project was the complete stripping of Nave roof north and south sides and recovering in lead with associated timber/joinery work . Other works as part of the project included a new metal walkway from stair turret to tower stairs, a bridge between the south transept and nave roofs, crawler ladders, steps to the tower and hand/grab rails. Stonework generally to the parapet was carried out.
Working through the winter months was made possible by shrouding the scaffolding with shrink wrap.